Laserfiche WebLink
<br />' NCIG - 1991 HYDROLOGY REPORT <br />2.0 HYDROLOGIC MONITORING <br />' 2.1 Data Collection <br />Field and laboratory data were collected during the spring, summer, <br />fall, and winter quarters of the 1991 season from the following <br />' monitoring sites: OW-3L, 7, 8, 12, 13, and 14, as per the June 13, <br /> 1988 NCIG Technical Revision (OW-4L w as destroyed during 1989 as <br />' previously discussed). In addition, well LO-1, located at the <br /> proposed l oad-out facility was also monitored. Monitoring was <br /> performed on the following dates: <br /> Winter January 7, 1991 <br />t Spring April 22, 1991 <br /> Summer July 23, 1 991 <br /> Fall October 8, 1991 <br /> <br /> Field and laboratory data were col lected during the fall quarter <br />' (annual sampling frequency), and field parameters only were <br /> collected during the spring, summer, and winter quarters (quarterly <br />' sampling frequency). <br />' Since the tunnels have remained sealed since 1986 and there has not <br />been any activity on the site during 1991, NCIG has remained on the <br />quarterly field parameters, annual lab analysis schedule through <br />' 1991. This schedule will be maintained until activity resumes at <br />the site. <br /> <br />' Adrian Brown Consultants <br />-2- Ref:1145/920114MG:HYD <br /> <br />1 <br />