My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP21573
DRMS
>
Back File Migration
>
Report
>
REP21573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:54:51 PM
Creation date
11/27/2007 3:11:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Report
Doc Date
5/6/1987
Doc Name
WYO FUEL CO NEW ELK GOLDEN EAGLE MINES HYDROLOGIC MONITORING REPORT 1ST QUARTER 1987
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• 2.0 MorriTORINC M~rHODs <br />2.1 Surface Water <br /> <br />Monthly surface water samplings were conducted at each of the <br />seven designated stations PRS-1, PRS-2, PRS-3, West Portal, MDNE-1, MDGFrl, <br />CCS-1 and CC`S-2. Quarterly surface water samplings were conducted at each <br />of the four designated stations CCS-1, CCS-2, West Portal, MDNE-1 and <br />MDGFrl. Annual water quality sampling will be conducted during November for <br />each station. <br />During each monthly sampling, in-situ water quality measurements <br />of temperature, conductivity and pH were made using a Hydro lab Nbdel 4000 <br />field sampling kit. An expanded list of water quality parameters was <br />collected during the quarterly sampling which were sent to ire <br />Laboratories, Inc., of Denver for laboratory analysis. water quality <br />parameters for annual sampling are filtered for dissolved parameters in the <br />• field with a Geotech 2.4 liter barrel filter. <br />Quality control of water analysis was performed by two methods. <br />Prior to any field sampling, the Hydro lab Sampling Kit was calibrated to <br />known standards produced in the laboratory. A record of each calibration <br />was kept as to the date, person performing the calibration, and adjustments <br />made. Oore~laboratories, Inc. maintains internal quality control of sample <br />handling andinstru<nentation calibration. <br />Water quality or flow measurements were conducted by a number of <br />methods. A straight, flat, stable reach of each stream station was selected <br />as a sampling location in 1984. Across-section was surveyed perpendicular <br />to the stream flow and permanently marked with stakes and flagging. Flvu <br />was measured with a Teledyne-Gurley hbdel 625 Pygny type current meter using <br />the USGS six-tenths-depth methods. For the 1985 program on the Purgatoire <br />River station, staff gages were established on bridges above, between and <br />below the two mines providing data to calculate a stage-discharge curve for <br />. future discharge measurements. At the mine discharge stations, discharge <br />
The URL can be used to link to this page
Your browser does not support the video tag.