© Ms. Smr6: Brown <br />Drtisimi cf Al urraLs mrl Cm'ogy <br />/~.~ls, zooo <br />n~ z <br />4.0 ROADS <br />The width of both the main haul road and the access road across Bush Draw were reduced in <br />1995. The remaining road segments are classified as permanent and temporary light-use roads, <br />respectively, for post-reclatation access. There was a limited amount of light-use road, associated <br />with the powder magazine site, reclaimed in 1999. See the attached 1999 Reclamation Map for <br />general location. <br />5.0 TOPSOILING AND REVEGETATION <br />Topsoiling and seeding was conducted in two small areas within the mine area and included the <br />azea of debris disposal and the powder magazine and adjacent topsoil stockpile. The topsoiling <br />and seeding was conducted on approximately 6.5 acres. See the attached 1999 Reclamation Map <br />for approximate locations. <br />6.0 NOXIUOS WEED CONTROL <br />Selective spraying was conducted to control and eliminate minor infestations of thistle. All musk <br />thistles encountered were hand dug and destroyed. The sprayed areas will be inspected next spring <br />to evaluate weed control success and re-sprayed as necessary. See the attached 1999 Reclamation <br />Map for general location of the areas where spraying or other control was conducted. <br />7.0 DRAINAGE AND SEDIMENT CONTROL <br />Three areas of minor disturbance associated with erosion control maintenance were remediated <br />and reseeded in 1999. Two areas of rill and gullying in the pre-1986 reclamation area were <br />remediated, topsoiled and reseeded. Contour furrows were installed in Pit 1 in an effort to <br />maintain erosion control along the southaestem portion of the slope. See attached 1999 <br />Reclamation Map for general locations. <br />Routine inspection and maintenance was performed on the rernairtder of the ponds, ditches and <br />other drainage and control structures. <br />8.0 TOPSOIL STOCKPILES <br />The topsoil stockpile originally located adjacent to Pond B was removed and redistributed on <br />reclaimed areas at the mine area and used to complete final reclamation at the Loadout. Following <br />removal of this excess topsoil, the area was seeded with the approved permanent seed mix This <br />reduced the area of remaining topsoil stockpiles at the mine area by approximately 2.5 acres. <br />9.0 SURFACE FACILITIES <br />As shown on the 1999 Reclamation Map, the remaining permanent facilities (roads, buildings and <br />ponds) at the mine area contain approximttely 35 acres. <br />10.0 LOADOUT AREA <br />Final reclamation activities were completed at the Loadout area (approximately 5 acres) during <br />1999. The remaining debris from dismantling the tipple was hauled to the mine and buried along <br />