Laserfiche WebLink
INSPECTION REPORT -SEDIMENT PONDS <br />DISCHARGE POINT 001 - STREETER FII.L SEDIMENT POND <br />Date of Inspection: , ~/0 93 <br />Are all embankments, spillways and dewatering devices in order aS per the certified design? 1L <br />If no, explain: <br />DISCHARGE POINT 002 -WORK AREA POND <br />Date of Inspection: S /l' 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, exp]ain: <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: ~ri~, 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~ ~> <br />If no, explain: <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: S/l~- 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~~ <br />If no, explain: <br />DISCHARGE POINT 005 -STOKER COAL LOADOUT POND <br />Date of Inspection: ~ /~' 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~~ <br />If no, explain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP POND <br />Date of Inspection: S/~' l3 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? .~: <br />If no, explain: <br />DISCHARGE POINT 007 -PROSPECT POND <br />Date of Inspection: ~ ~ %! 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? KGs <br />If no, explain: <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: -S/l' 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~ s <br />If no, explain: <br />Signed: /~~~.' /7r~s Date ~'~~ ~J <br />Under the direction of Robert G. Trumbly, Jr., P.E. No. 16957 <br />