Laserfiche WebLink
INSPECTION REPORT -SEDIMENT PONDS <br />DISCHARGE POINT 001 - STREETER FII.L SEDIMENT POND <br />Date of Inspection: ~/9 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? , ~s <br />If no, explain: <br />DISCHARGE POINT 002 -WORK AREA POND <br />Date of Inspection: i' /9 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? l~ <br />If no, explain: <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: % /9 93 <br />.~- <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: f' /9 9 3 <br />Are all embankments, spiiways and dewatering devices in order as per the certified design? %5 <br />If no, explain: <br />DISCHARGE POINT 005 -STOKER COAL LOADOUT POND <br />Date of Inspection: ~'/9 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? %~"s <br />If no, explain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP POND <br />Date of Inspection: %' /9 7 3 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 007 -PROSPECT POND <br />Date of Inspection: ~ /° 9~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~s <br />If no, explain: <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: ~' /9 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ii <br />If no, explain: <br />Signed: ~/,1.~ %~r~:r Date f /9 9S <br />Under the direction of Robert G. Trumbly, Jr., P.E. No. 16957 <br />