Laserfiche WebLink
III I II I II I II IIII III Doc Date;12111/2001 <br />999 INSPECTION REPORT -SEDIMENT PONDS Cx{, ~,a i ~ ~ <br />DISCHARGE POINT 001 - STREETER FII.L SEDIMENT POND <br />Date of Inspection: //•/S 9.3 / <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~~_ <br />If no, explain: <br />DISCHARGE POINT 002 -WORK AREA POND <br />Date of Inspection: ///S 9_3 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~~f <br />If no, explain: <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: //• /S y3 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? r; <br />If no, explain: <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: // /S1~3 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? s <br />If no, explain: <br />DISCHARGE POINT 005 -STOKER COAL LOADOUT POND <br />Date of Inspection: //~ /S• 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? > <br />If no, explain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP POND <br />Date of Inspection: // /3 5'~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? `~` <br />If no, explain: <br />DISCHARGE POINT 007 -PROSPECT POND <br />Date of Inspection: // /S 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~~ <br />If no, explain: <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: ///S 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? s <br />If no, explain: <br />Signed: ~ ~ ~ c.r Date ///S- 9_ <br />Under the direction of Robert G. Trumbly, Jr., P.E. No. 16957 <br />