Laserfiche WebLink
INSPECTION REPORT - SIDIIVIIIVT PONDS <br />DISCHARGE POINT 001 - STREETER FII.L SEDIMENT POND <br />Date of Inspection: .3•/4. 9'3 / ~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 002 -WORK AREA POND <br />Date of Inspection: ~ • / 3 9.3 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: .~ /.~• 9_3 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~-s <br />If no, explain: <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: .j'•% 9.3 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? mil/ <br />If no, explain: <br />DISCHARGE POINT 005 -STOKER COAL LOADOUT POND <br />Date of Inspection: ._~ % 3. 9 3 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? its <br />If no, explain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP POND <br />Date of Inspection: ~'•%3 9 >' <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~s <br />If no, explain: <br />DISCHARGE POINT 007 -PROSPECT POND <br />Date of Inspection: ~ - /~~ 93 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? mil/ <br />If no, explain: <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: .~'• /~ y4 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~-- <br />If no, explain: <br />Signed: ~ Date . ~/° 93 <br />Under the direction of Robert G. Trumbly, Ir,, P.E. No. 16957 <br />