Laserfiche WebLink
planned for the plant and wellfield. Additional centrifuge, silo, storage bins and conveyor <br />• upgrades may be installed. Projects to upgrade the food safety of the product will be <br />initiated on an ongoing basis. Projects to meet other customers demands such as specialty <br />products will be undertaken as accounts and economics dictate. <br />Wellfield <br />A new horizontal well pair in panel #2 (7H) and possibly a second vertical recovery well for <br />1A cavity is planned. Shut in wells 2A-2V, 91-1V and 93-3V are scheduled for plugging and <br />abandonment. One of the planned P/A wells maybe converted to a second water well. <br />Replacement or service of submersible pumps will be performed as needed. <br />• 4.0 2003 PROJECT ACTIVITIES <br /> <br />4.1 On$ite Facilities and Process Description <br />4.1.1 General Arrangement <br />Figure 2-1 illustrates location of project leases, mining area, monitoring wells, access road and <br />associated utility lines. <br />4.1.2 Lab Operation / SanitatioN ISO <br />In 2003, operations continued in the lab to provide analysis for process control, quality <br />assurance, and regulatory requirements, The plant operators performed several crucial <br />I . <br />8 <br />