My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17538
DRMS
>
Back File Migration
>
Report
>
REP17538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:35 PM
Creation date
11/27/2007 2:10:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983176
IBM Index Class Name
Report
Doc Date
7/24/2000
Doc Name
CONDITIONAL USE PERMIT APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br />1 <br /> <br /> <br /> <br />(e1 Timetables for Mining and Reclamation Operations <br />Banks and Gesso, LLC <br />The mining and the start of reclamation operations anticipated by the Applicant, <br />dependant on market demand, are summarized below: <br />Phase fear Mining in <br />Area Mined <br />Acres Reclamation <br />in Area <br />1 1-5 1,3 29.6 1,3 <br />2 6-7 2,3 6.2 1,3 <br />3 8 NA NA 1 8 2 <br />The mining, plant operations and reclamation activities for each phase are <br />described in the sections below. <br />Phase 1 <br />The Applicant will erect the aggregate processing plant, maintenance facilities <br />and set-up the office in Area 2. The initial aggregate plant site in will be stripped <br />of topsoil and overburden, prior to erecting the processing equipment. The <br />recycling plant will be erected on stripped ground. The initial mining in Area 1 will <br />be to enlarge the existing pond at the southern end of the property for use as <br />process water and fresh water ponds. These materials will be stockpiled for later <br />processing. Stripping of areas in the northern portion of Area 1 will allow the <br />excavation of de-watering ditches, sediment and sump areas, and setting the <br />pumping systems. Powerlines will be constructed to provide power for the <br />electric de-watering pumps and plant equipment. Subsequent mining of Area 1 <br />will progress southwan~ during Phase 1. Mining with a near vertical face will <br />occur in Area 1, followed immediately by slope backfill as soon as the mining <br />limits have been reached. This will allow concurrent backfill of slopes with <br />overburden being stripped during the next phase. The recycle plant will be <br />relocated to the pit Hoer in the southern portion of Area 1, when there is sufficient <br />room. <br />Area 3 Mining and Reclamation Procedures <br />' The procedures described below were developed in conjunction with Urban <br />Drainage 8 Flood Control District after numerous meetings on how to mine and <br /> reclaim Area 3, while minimizing the risk of headcutting in the South Platte River. <br />' The proposed reclamation will enhance the quality of wildlife habitat in Area 3, <br />which will be placed in a conservation easement after mining operations are <br /> completed. These procedures will maximize resource recovery for the property, <br /> while complying with Urban Drainage and Flood Control District's requirements <br />' for Gravel Mining Activities. <br />' Speer Mining Resource 9 99035 <br />Asphalt Specialties Company, Inc July 24, 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.