Laserfiche WebLink
t <br />We were advised that the mine had produced approximately 27, 007 cubic yazds of waste coal during the <br />month of October 2004: 20,689 cubic yazds during November 2004: and approximately 21,467 cubic yazds <br />during December 2004. It is our understanding that the fines being produced at the wash plant, which <br />consists of 10 to 20 percent of the total materials being produced, aze being pumped underground into the <br />mine. <br />Based on our limited observations, it appears that the pile is currently being constructed and maintained in <br />general accordance with the project specifications and plans submitted under 2.05.3(8) and that the <br />potential hazard to human life and property at the site in its present condition is minimal. This report <br />fulfills the quart~rty inspection requirements as specified by Rules 4.09.1(11)(a), 4.09.1(11)(b), 4.10.2(2)(a) <br />and 4.10.2(2) /f4u„ you have any questions regarding this report or our observations, please contact this <br />office. <br />~~ <br />coo <br />%Ft'' ~~ ~~.;; . <br />xc: Sg;;, a ~~~Walker -Division of Minerals & Geology <br />s" L ICU ~ ` <br />Job Number: 99-3983 NWCC, Inc. Page 2 <br />