My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15044
DRMS
>
Back File Migration
>
Report
>
REP15044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:42 PM
Creation date
11/27/2007 1:35:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
3/24/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112D-3 HARD ROCK METAL AND DMO ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Areas of Disturbance <br />The following is a summary of the areas of disturbance at the San Luis Project: <br />Permitted Actual Under <br />Area Disturbance Disturbance Reclamation <br />East Pit 20 acres 20 acres 20 acres <br />West Pit 110 100 88 <br />Waste Rock A 0 0 0 <br />Waste Rock B 18 18 10 <br />Waste Rock C 30 28 28 <br />Waste Rock D 42 42 42 <br />Seuth Waste Rock 50 35 35 <br />Mill Area 26 26 4 <br />ESI Heap 8 8 8 <br />Test Heap 10 10 0 <br />Borrow Area 11 10 0 <br />Roads 30 20 0 <br />Tailinos Area 192 192 10 <br />Reclamation <br />done 1996 <br />Total Area 547 acres 509 acres 245 acres <br />* Reclamation done in 1996 consisted of continued backfilling of the West Pit with a total of 3,570,632 tons <br />deposited in the backfill. Topsoiling and seeding of the benches in the West Pit continued. The South <br />Waste Rock area had additional sloping and topsoiling. Waste Rock D also had additior al topsoiling. <br />Site Monitoring and Reporting <br />Quarterly water sampling in accordance with TR-06 QA/QC, took place in January, April, July, <br />and October. Analysis reports were submitted to DMG upon receipt from the analytical lab. <br />During 1996, six months of monthly sampling was performed on the new wells M-15, <br />M-4R, M-11 R, and SF-1. This will be followed by 6 months of bi-monthly sampling. <br />Quarterly sampling will be initiated in July, 1997 on these wells. <br />Bi-weekly, in accordance with NOV abatement requirement No. 3, and weekly water sampling <br />and water level reading frequency continued throughout the year. Analysis reports have been <br />submitted to DMG upon receipt from the analytical lab. <br />Lysimeters have been checked quarterly throughout the year and have remained dry. <br />Sampling of the San Luis City Well and The Shalom Ranch well occurred in January and July <br />and results have been forwarded to the applicable parties. <br />The underdrain at the base of the tailings embankment was monitored monthly for rate of <br />seepage. The underdrain continually flowed at an average of 35 gpm. <br />
The URL can be used to link to this page
Your browser does not support the video tag.