Laserfiche WebLink
Results from the humidity cell testing on the quarterly composite samples for 1996 are enclosed. <br />Fourth quarter 1995, first quarter, and second quarter 1996 have been discontinued. The third <br />and fourth quarter of 96 continue. <br />Staff gauges were read daily from April -June and weekly during the other months. RS-4 and <br />RS-6 continue to be dry. The staff gauge at RS-5 will be relocated in the upcoming Spring. <br />The tailings embankment piezometers have been checked and monitored monthly. Piezemeter <br />P6 has a level of approximately 12 inches but has stabilized at that point. <br />The collection pond leakage detection system was sampled and pumped monthly. The <br />average leakage rate was about 20 gpad. <br />As specified in the approved TR-010, weekly and monthly pond compliance reports have <br />been submitted tc DMG. <br />Enclosed is the $1,000 annual fee payment and a property map showing disturtance and <br />reclamation activities. Also enclosed, please find a copy of the Financial Warranty. There <br />have been no significant changes on the map since 1995, therefore the map remains the <br />same as shown in TR-018. <br />Sincerely, <br />~~ ~~~r7 <br />Richard Neu & Ron Zumwalt <br />Enclosures <br />cc: Anne Baldrige <br />Dan Robertson <br />