<br /> <br />' San Luis Project - Phaae II Rain 1 expansion Copstruction Statw Report <br />' selected construction monitoring data, the evaluations made as to potential impacts associated <br />with the modifications, and an evaluation of current and future conditions at the facility with <br />' respect to the Division's concerns. Although the report is intended to focus on the primary <br />issues raised by the Division, it has not been limited to these issues. The report discusses all <br />field engineering adjustments made to date. In addition, the report includes proposed <br />' modifications to Section 7.0 of the Technical Specification presented in Appenclu F of the Phase <br />II Raise 1 Design Report to clarify construction activity reporting obligations. <br />The information presented herein is predicated on an overall familiarity with the project. A <br />thorough understanding of the following documents is necessary to assimilate the information <br />presented in this report: <br />• 112 Permit Application, San Luis Project, CostilLi County, Colorado, 2nd <br />Revision dated April 1989; <br />' • 112 Permit Application Amendment, San Luis Project, Costilla County, <br />Colorado, dated September 1989; <br />• San Luis Project, Permit Adequacy Responses, M-88-112, dated January 9, 1990; <br />' • San Luis Mine, Tailings Disposal Area Construction Report, dated July 1941; <br />• Letter from Andre Douchane to Jim Pendleton dated June 3, 1992 with <br />attachments; <br />• Letter from ALula Scott to Larry Oehler dated July 12, 1993 and accompany <br />report entitled San Luis Mine, Phase II, Raise 1 Design Report; <br />' Letter from Alana Scott to Larry Oehler dated July 28, 1993 with enclosure from <br />SRK dated July 2, 1993; <br />' Letter from Alana Scott to Larry Oehler dated September 13, 1993; and, <br />' • Letter from Alana Scott to Larry Oehler dated September 30, 1993; <br />October, 1993 Z SRK Project No. 14725 <br />