Laserfiche WebLink
to contain water ding Jure aryl July 1993. <br />SORFACE iWTHt !lNITCRIPIC STATZ01~ - BPRIIiC,B <br />Fast ROatCdD Creek <br />Two springs were monitored in the Fast Roatcap Creek drainage (refer to Table 5 <br />aryl Map No. 4-1) during 1993. Spring 30 exhibited consistent flows throughout <br />the year and water quality parameters in the fall consistent with previous <br />samplings at this site. Spring 30 was PTM~.r ~~ by the angle-of-draw of Panel <br />Y during May of 1993. Spring 10-10 was added to the monitoring network by PR-03 <br />in 1993. Monitoring at this site was initiated in August with measured flows and <br />field parameters consistent with previous readings. Spring 10-10 was encompassed <br />by the angle-of~iraw of Panel Y during September, 1993. Subsidence i~acts were <br />not apparent at either of these locations during 1993. <br />r1 <br />U <br />West Roatcao Creek <br />Three springs were monitored in the West Roatcap Creek drainage (refer to Table <br />5 aryl Map No. 4-1) during 1993 with two of these three added to the monitoring <br />network as a result of PR-03. Spring 31 was monitored on a monthly basis and <br />exhibited wnsistent flows throughout the year which were generally higher as <br />compared to 1992. Water quality parameters were consistent with ranges <br />previously established for this site. No mining occurred within the watershed <br />for this spring during 1993 and no mining impacts were evident. Spring 32 was <br />added to the monitoring as a result of PR-03. Monitoring was conducted in <br />October 1993 and included the initial flow ~~~~rement and water quality sampling <br />for this location. Future monitoring will be conducted on a monthly basis along <br />with Spring 31. Spring 10-13 was also added to the monitoring network as a <br />. result of PR-03. Flows and field parameters observed at this site were <br />wnsistent with previous baseline values. No mining occurred during 1993 in the <br />12 <br />