Laserfiche WebLink
• <br />of the process and waste ponds will be reported. Also, a plan for alined pit for disposal <br />of bicarb/soil and containment of well head spills was submitted/approved by the DMG. <br />3.1.2 Protect Activities <br />Major capital work at the facility in 1995 included process modifications for fines recovery <br />system to improve plant efficiency and production volume. Well head equipment and <br />piping, associated with cavity #4 were installed. Submersible downhole pumps were <br />installed in cavities #3 and #4 in May. In October the pump from cavity #3 was moved <br />to cavity #1. <br />3.1.3 1995 Production Summary <br />i <br />• <br />Month Beginning Production Adjust Sales Ending <br />Inventory to Storage Inventory <br />January 3061 2953 (284) 3985 1745 <br />February 1745 2808 (12) 3065 1476 <br />March 1476 4000 (156) 4204 1116 <br />April 1116 3315 3551 880 <br />May 880 1719 (51) 2059 489 <br />June 489 3816 3854 451 <br />July 451 3451 167 3255 814 <br />August 814 5141 250 4184 2021 <br />September 2021 5910 22 4892 3061 <br />October 3061 4434 1 3796 3700 <br />November 3700 2349 3307 2742 <br />December 2742 6331 5932 3141 <br />TOTALS 46,227 (63) 46,083 <br />6 <br />