4.3.4 Geotechnlcal Program <br />• No sonar surveys were taken on the vertical sonar access well for caviy #3 or the two <br />vertical recovery wells for cavities #3 and 4. Both wells for cavity #3 had significant <br />debris buildup which would not allow the sonar tools to pass and cavity #4 had a <br />submersible pump installed in the well. <br />WRN plans to sonar survey both cavity #1 and 4 during 1996. WRN will preform a sonar <br />survey of cavity #1 following mining of additional 6000 tons or a total of 48,000 tons. The <br />sonar survey of cavity #4 will be more difficult, but should take place around a pump <br />failure or some other reason which requires the pulling of the pump. <br />Gamma ray logs and temperature logs were taken on cavity #4 following initial <br />• completion. Several weeks after sustaining production to the plant, the mining was <br />stopped and temperature logs (three per production wells) were obtained during cool <br />down. <br />4.3.5 Lease or Mine Plan Modification <br />In 1993, a request was submitted to the BLM for a lease modification. If approved, a <br />520 acre window would be added to a contiguous lease and an equal (approximately) <br />amount of acreage would be relinquished. An economic evaluation of this lease <br />modification was in process throughout 1995, regarding cost for lease modification. <br />• 23 <br />