My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP10245
DRMS
>
Back File Migration
>
Report
>
REP10245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:39:44 PM
Creation date
11/27/2007 12:21:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Report
Doc Date
5/26/1988
Doc Name
SUBMITTAL OF ANNUAL REPORTS FOR CASTLE CONCRETE
From
MARK A HEIFNER
To
MLR
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />In order to provide some stabilization to the east end of the shop <br />slope which was badly slumping the previous year, a berm was initiated at <br />the base of the slope. Also, some fill was placed across the road and just <br />east of the office in order to provide a small stockpile area and <br />additional parking. The outslopes of this area were graded and seeded. <br />Also, the drainage channel east of the road was graded and seeded. <br />Later this channel will be stabilized with rip rap and drop structures. <br />All total about 19 acres of the operation is under some stage of <br />reclamation, and most of that is under some stage of revegetation. This <br />area does not include the approximately 5 acres of the old Peter Kiewit <br />stockpile area which has been reclaimed even though it is not part of the <br />mining plan. There is, in total, about 23 acres under some stage of <br />reclamation. <br />RULE 2,41 3 THE LOCATION AND NUMBER OF ACRES IN THE VARIOUS STAGES OF <br />RECLAMATION (BACKFILLED, GRADED, TOPSOIL REPLACED, REVEGETATED), <br />The various areas under reclamation are as follows, <br />LOCATION STAGE AREA <br />Waste Pile Revegetation 3.25 acres <br />Shop Slope Revegetation 1,75 acres <br />Shop Backslope Revegetation 1.25 acres <br />East Shop Slope Revegetation 1,40 acres <br />Tract WDT Revegetation 2.50 acres <br />Drainage Channel Revegetation 2.00 acres <br />Parking Revegetation 0.50 acres <br />Access Road Revegetation 4.00 acres <br />Support Berm Construction 1.50 acres <br />Old Stockpile Revegetation 5.00 acres <br />23.15 acres <br />Some of the areas presented in this list are not discussed here or <br />shown on the annual report map. These areas are older and are discussed in <br />previous annual reports. <br />RULE 2.41 4 THE SPECIES OF VEGETATION PLANTED, THE LOCATIONS AND <br />APPROXIMATE DATES OF PLANTING. <br />All areas were planted in late March or early April. The areas seeded <br />were as follows: <br />Parking Area <br />Drainage Channel <br />Supplemental on Shop <br />Supplemental on East <br />Topsoil Stockpile <br />Page 2 of 4 1988 PIKE' <br />.5 acres <br />2.0 acres <br />Slope .25 acres <br />Shop Slope .5 acres <br />.25 acres <br />7IEW QUARRY ANNUAL REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.