Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />August 2002 Monthly Report <br />Page 2 <br />tailing impoundment during the month, and seepage along Rito Seco Creek remained dry <br />throughout the month. <br />Calendar year 2002 reclamation activities were initiated on August 29`h. Earthmoving <br />equipment has been leased from Wagner Equipment Supply with the equipment being <br />operated by on-site personnel during hours the water treatment facility is not operating. <br />Leased equipment will include a Caterpillar D-8R, Caterpillar 936 loader and two (2) <br />Caterpillar 30-yard haul trucks. Scheduled reclamation activity includes the east flank of <br />the South Waste Rock Facility, the main haul road between Rito Seco road and the <br />parking ditch, the parking ditch and the access roadway north of the South Waste Rock <br />Facility leading to the air monitoring tower. Reclamation activities shall include <br />recontouring, surface compaction ripping, topsoiling and revegetation. It is expected the <br />reclamation activity will require approximately a month to six weeks. <br />Table 1-August 2002 Depth to Water Measurements <br />Monitorin Site Date De th to Water (feet) <br />M-1 8/30/02 74.15 <br />M-10 8/30/02 25.93 <br />M-I 1 8/30/02 35.52 <br />M-11 R 8/30/02 44.79 <br />M-16 8/30/02 23.31 <br />M-17 8/30/02 33.42 <br />M-18 8/30/02 27.61 <br />M-19 8/30/02 25.96 <br />M-20 8/30/02 26.11 <br />M-21 8/30/02 18.41 <br />M-22 8/30/02 17.59 <br />M-23 8/30/02 45.79 <br />M-24 8/30/02 26.97 <br />M-25 8/30/02 Dr <br />M-26 8/30/02 18.49 <br />M-27 8/30/02 Dr <br />M-28 8/30/02 25.79 <br />M-29 8/30/02 27.80 <br />M-30 8/30/02 27.17 <br />M-31 8/30/02 44.37 <br />M-32 8/30/02 49.20 <br />M-33 8/30/02 43.90 <br />M-34 8/30/02 23.90 <br />