Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />August 2002 Monthly Report <br />Page 3 <br />Table 1-August 2002 Depth to Water Measurements (continued) <br />Monitorin Site Date De th to Water (feet) <br />BF-1 8/30/02 28.55 <br />BF-2 8/30/02 32.31 <br />BF-3 8/30/02 29.99 <br />BF-4 8f30/02 25.81 <br />BF-SR 8/30/02 31.68 <br />BF-6 8/30/02 31.70 <br />Bp_7 8/30/02 41.29 <br />gp_g 8/30/02 Dr <br />BF-9 8/30/02 40.52 <br />BF-10 8/30/02 41.77 <br />BF-11 8/30/02 42.65 <br />BF-12 8/30/02 40.93 <br />BF-13 8/30/02 35.30 <br />BF-14 8/30/02 34.67 <br />DW-1 8/30/02 34.13 <br />DW_2 8/30/02 26.79 <br />p W_ 1 8/30/02 29.02 <br />pW_2 8/30/02 26.79 <br />PW_3 8/30/02 36.69 <br />PW_4 8/30/02 31.47 <br />PW-5 8!30(02 27.50 <br />SF-1 8/30/02 19.22 <br />SF-1 R 8/30/02 23.47 <br />SF-2 8/30/02 26.19 <br />SF-3 8/30/02 43.41 <br />SF-4 8/30/02 26.60 <br />SF-5 8/30/02 33.11 <br />pC_2 8/30/02 39.59 <br />D8724 8/30/02 60.11 <br />LS-1 8/28/02 Dry <br />LS-2 8/28/02 Dry <br />LS-3 8/28/02 Dr <br />LD-1 8/28/02 Dr <br />LD-2 8/28/02 Dr <br />LD-3 8/28/02 Dry <br />P6 8/28/02 Dry <br />