My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP04773
DRMS
>
Back File Migration
>
Report
>
REP04773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:35:55 PM
Creation date
11/26/2007 10:54:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
4/16/1993
Doc Name
1992 ARR Exhibit 4 SEDIMENT PONDS 1992 INSPECTION REPORTS
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT - SIDIlI~TT PONDS <br />DISCHARGE POINT 001 - STREETER FILL SEDIMENT POND <br />Date of Inspection: x/3.92 <br />Are~~1 embankments, s illways and ewatering devices in order as per the certified <br />If ~dd`; explain: ~~~rrr~ ~ _~ / i/may 1~9 ~ <br />design? <br />DISCHARGE POINT 002 -WORK AREA POND <br />Date of Inspection: ~/3.,P, <br />Are,~ll embankments, spillways and dewaterin devices in order as per the certified <br />If ,explain: _ ~,_~ %-~~ ~~ <br />design? ~~_ <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: ~ /x,91 <br />Are 1 embankments, spillways and dewatering devices in order as per the certified design? <br />Ifexplain: ~ /~D ~s~ <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: h'/ ~ • 91 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain: <br />DISCHARGE POINT 005 -STOKER COAL LOADOUT POND <br />Date of Inspection: 1~/~• 91 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP POND <br />Date of Inspection: x/3.92 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain: <br />DISCHARGE POINT 007 -PROSPECT POND <br />Date of Inspection: f •/3. 91 <br />Are all embankmenu,~pillways an dewatering devices in order as per the ce fied design? ~~ <br />If no, explain: ~i.•rv / />if~:3r.,.~ ~~ ~,aoa•>,n,J ~~~sr~~~~,,.d <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: ~/3~ 9z <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain: <br />Signed: ~-, Date ~/ ~• ~~ <br />Under the direction of Robert G. Trumbly, Jr., P.E. No. 16957 <br />
The URL can be used to link to this page
Your browser does not support the video tag.