Laserfiche WebLink
INSPECTION REPORT - SIDIlI~TT PONDS <br />DISCHARGE POINT 001 - STREETER FILL SEDIMENT POND <br />Date of Inspection: x/3.92 <br />Are~~1 embankments, s illways and ewatering devices in order as per the certified <br />If ~dd`; explain: ~~~rrr~ ~ _~ / i/may 1~9 ~ <br />design? <br />DISCHARGE POINT 002 -WORK AREA POND <br />Date of Inspection: ~/3.,P, <br />Are,~ll embankments, spillways and dewaterin devices in order as per the certified <br />If ,explain: _ ~,_~ %-~~ ~~ <br />design? ~~_ <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: ~ /x,91 <br />Are 1 embankments, spillways and dewatering devices in order as per the certified design? <br />Ifexplain: ~ /~D ~s~ <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: h'/ ~ • 91 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain: <br />DISCHARGE POINT 005 -STOKER COAL LOADOUT POND <br />Date of Inspection: 1~/~• 91 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP POND <br />Date of Inspection: x/3.92 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain: <br />DISCHARGE POINT 007 -PROSPECT POND <br />Date of Inspection: f •/3. 91 <br />Are all embankmenu,~pillways an dewatering devices in order as per the ce fied design? ~~ <br />If no, explain: ~i.•rv / />if~:3r.,.~ ~~ ~,aoa•>,n,J ~~~sr~~~~,,.d <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: ~/3~ 9z <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain: <br />Signed: ~-, Date ~/ ~• ~~ <br />Under the direction of Robert G. Trumbly, Jr., P.E. No. 16957 <br />