Laserfiche WebLink
INSPECTION REPORT - SIDIIl4ENT PONDS <br />DISCHARGE POINT 001 - STREETER FILI. SEDIMENT POND <br />Date of Inspection: _ S 9~ 9.? <br />Are all embankments, spillways and dewatering devices in order as per the certified <br />If no, explain: <br />design? <br />DISCHARGE POINT 002 -WORK AREA POND <br />Date of Inspection: S9 91 <br />Are all embankments, spillways and dewater;ng devices in order as per the certified design? ~ <br />If no, explain: <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: ,S 9 91 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain; <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: .f 9.92 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain; <br />DISCHARGE POINT 005 -STOKER COAL LOADOUT POND <br />Date of Inspection: -f 9.91 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, exp]ain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP POND <br />Date of Inspection: ..59 91 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain: <br />DISCHARGE POINT 007 -PROSPECT POND <br />Date of Inspection: _ S9. 91 <br />Are all embankments, <br />If no, explain: <br />ways and dewate~ing devices in order as per the certified design? <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: .~ ~• 9I <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~~ <br />If no, explain: <br />Signed: Date S 9~ 92 <br />Under the direction of Robert G. Trumbly, Jr., P.E. No. 16957 <br />