My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP04773
DRMS
>
Back File Migration
>
Report
>
REP04773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:35:55 PM
Creation date
11/26/2007 10:54:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
4/16/1993
Doc Name
1992 ARR Exhibit 4 SEDIMENT PONDS 1992 INSPECTION REPORTS
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~II 1~~1}{!II~`III~` Doc Date:12/11/2001~ <br />I 1 9 1 1 INSPECTION REPORT - SEDIlI7ENT PONDS c X rf i 6 /-7-' <br />DISCHARGE POINT 001 - STREETER FTI.L SEDIIvfENT POND <br />Date of Inspection: // //' 9~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 002 -WORK AREA POND <br />Date of Inspection: // // ~ 9~ ~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? _ ~r <br />If no, explain: <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: ////-9.~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain: <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: // // 91 , <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT QOS -STOKER COAL LOADOUT POND <br />Date of Inspection: //~ // • 9~ _ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP POND <br />Date of Inspection: //• // • 9.~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 007 -PROSPECT POND <br />Date of Inspection: // // ~ 92 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: ~/// 91 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? fs <br />If no, explain: <br />Signed: _ <br />Under the <br />~,/ /~~~ Date , <br />of Robert G. Trembly, Ir., P.E. No. 16957 <br />
The URL can be used to link to this page
Your browser does not support the video tag.