Laserfiche WebLink
ENERGY FUELS COAL, INC. <br />SOUTI~'IEELD MINE _ <br />P.O. BOX 449 <br />FLORENCE, COLORADO 81226 ;!:p (}~ 19gt; <br />QUARTERLY INSPECTION REPORT <br />COAL PROCESSING WASTE BANKS <br />Date of Inspection: July 18, 1994 <br />Waste Bank Identilicatioo: Primary Refuse Disposal Area <br />Waste Bank Location: Sec. 30, T20S, R69W, 6th P.M. <br />Fremont County, Colorado <br />Comments: The coal processing waste bank was visually inspected and found to be in general <br />compliance with the CMLRD approved Reconstruction Plant for the Coal Processing Waste Bank. <br />The topsoiled and planted areas of the waste bank exhibit good plant growth. <br />Recommendations: Variation in the characteristics of the coarse and fine refuse materials are to be <br />expected, depending on changes in the mine geology and nurtirtg practices. The fine material <br />should be sampled and tested to identify an acceptable range of plasticity characteristics. When <br />high clay content material is encountered in the mining operations, it should be sampled and <br />compared with this range, with selective placement of high plasticity materials in the pile to avoid <br />adverse stability impacts. <br />Inspected by: David J. Brent, P.E. <br />Colorado Registration No. 13290 <br />