My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP03942
DRMS
>
Back File Migration
>
Report
>
REP03942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:34:53 PM
Creation date
11/26/2007 10:40:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Report
Doc Date
8/14/1995
From
DAMES & MOORE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The following answer some of the questions which were raised during the Bid Walk on June 30, <br />1995. <br />Q. Can the rock wall be substituted with a cast in place concrete wall. <br />A. No the rock wall can not be substituted <br />Q. For bid purposes can we standazdize the number of rock bolts to be used. <br />A. For the purpose of bidding assume that 50 - 3 foot standazd mechanical rock bolts will <br />be used. No epoxy will be required. In addition please quote a price to install each <br />additional bolt after the fast 50. <br />Q. Can split set rock bolts be used instead of mechanical rock bolts. <br />A. Split Setm friction rock stabilizers may be used in place of mechanical rock bolts. <br />Q. The spec for the cast in place wall calls for a ten foot thickness, is this correct. <br />A. This is not correct. See the attached addendum for the correct thickness. <br />Q. Will the steel bulkheads need to be removed before the adits aze sealed. <br />A. In most cases the bulkhead should remain in place. The only exception is where thirty <br />feet of backfill can not be placed without removing the bulkhead. <br />
The URL can be used to link to this page
Your browser does not support the video tag.