Laserfiche WebLink
.~ <br />• SECTION 2 • <br />SCHEDULE OF CONTRACT PRICES AND PAYMENTS <br />Bid Items Description <br />Logan Wash Site <br />1. Mobilization/Demobilization <br />2. Adit Closure of the Following Sites: <br />a. Site A - Backfill Closure <br />b. Site B - Backfill Closure <br />c. Site C - Backfill Closure <br />d. Site D - Backfill Closure <br />e. Site E -Rock Bulkhead Closure <br />f. Site F - CIP Bulkhead Closure <br />Lump Sum Cost <br /> <br /> <br />3. Repair Fence at Site G, install barb wire and outriggers $ <br />4. Repair and/or Replace as Rock Retaining fence as <br />Necessary and Reinstall using 50 Rock Bolts $ <br />a. Each Additional Rock Bolt $ <br />Total <br />Bidder Initials <br /> <br />2-1 <br />