Laserfiche WebLink
! • • <br />3.2 INSTALLATION OF FACILITIES <br /> A. All facilities installed under this section shall meet the requirements of these <br /> specifications and all applicable codes. <br /> 3.3 TRAFFIC REGULATION <br /> A. Provide whatever means necessary, or as directed by the RESIDENT PROJECT <br />' REPRESENTATIVE for the safety of the public and all elements of this Project. <br /> 3.4 DEMOBILIZATION AND CLEANUP <br />' <br /> A. Following completion of the work, Subcontractor shall remove all equipment and <br /> temporary facilities not incorporated into the permanent work from the site. <br /> <br /> B. Waste materials generated by the Subcontractor shall be properly collected and disposed <br /> off-site in accordance with local, state and federal laws and regulations. <br />' <br /> C. Remove from the site or otherwise suitably dispose of all rubbish, debris, and <br />' materials, not to be incorporated into the work and all other accumulations resulting <br />from the work of this Contract <br /> . <br />' D. Comply with all applicable laws and regulations for the proper collection, storage, <br />transportation <br />and disposal of waste materials generated under work of this Contract <br /> , <br />. <br /> E. Leave all site work azeas in a clean, stable condition. <br />END OF SECTION 01505 <br />r <br /> <br />i <br /> <br /> <br />6-2 <br />