My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP03942
DRMS
>
Back File Migration
>
Report
>
REP03942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:34:53 PM
Creation date
11/26/2007 10:40:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Report
Doc Date
8/14/1995
From
DAMES & MOORE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5.4 Access to Site <br />5.5 No Telephone Service is Available <br />SC-6.0 SPECIFICATIONS <br />CONTRACTOR-Furnished Specifications <br />Specifications will be furnished in various stages. <br />Upon receipt of revised specifications, the SUBCONTRACTOR shall immediately review them <br />and then notify CONTRACTOR of any discrepancies or cost and schedule impacts noted. <br />Except when the change involves a reduction in wst or when previously identified as a change <br />by CONTRACTOR if CONTRACTOR is not notified in writing within 5 working days, it will <br />be understood by all parties that the revisions do not constitute a change to the CONTRACT and <br />no adjustment to the CONTRACT PRICE or schedule will be required. <br />SC-7.0 PROJECT PERFORMANCE SCHEDULE (MILESTONE DATES) <br />' Completion of the WORK shall be in accordance with the milestone dates listed below. It is <br />acceptable to complete any or all of the activities before the milestone date listed. <br />' Item Completion <br />Number Description Date <br />1 Mobilization July_,21.1995 <br />2 Close Adits, Finish Grade and Revegetate September 29. 1995 <br />I Sites A through F <br />3 Replace Fence at Site G S~[ember 29. 1995 <br />4 Repair/Replace Rock Retaining Fence <br />at Site H $gptember 29. 1995 <br />' S Demobilization September 29. 1995 <br />' SUBCONTRACTOR shall perform the WORK in accordance with the sequences, constraints <br />and time spans stigulated by the project schedule unless otherwise approved. Time is of the <br />essence in the performance of this CONTRACT. <br />SC-8.0 PROJECT SCHEDULE AND REPORTING REQUIREMENTS <br />8.1 Overall Project Schedule <br />1. The schedule milestone dates above (SC-8.0) represent the maximum time <br />4-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.