<br />default, breach or modification of any of the conditions of the CONTRACT unless expressly <br />stipulated in such waiver. <br />1 Failure by CONTRACTOR at any time to enforce or require strict compliance with any terms <br />and conditions of the CONTRACT will not constitute a waiver of or impav the terms and <br />conditions in any way, nor shall such failure affect the right of CONTRACTOR to avail itself <br />at any time of remedies it may have for any subsequent breach of terms and conditions by <br />SUBCONTRACTOR. <br />' GC-30.0 SUSPENSION OR TERMINATION FOR CONVENIENCE <br />' CONTRACTOR reserves the right to suspend or terminate the CONTRACT at any time for its <br />convenience. Such suspension or termination will be made in writing and may include the whole <br />or any specified part of the CONTRACT. <br />' If the CONTRACT, or a specified part thereof, is suspended for wnvenience of the COMPANY <br />' or CONTRACTOR, and such suspension unreasonably delays the progress of the WORK and <br />causes additional expenses or loss to SUBCONTRACTOR in the performance of the WORK, <br />not due to the fault or negligence of SUBCONTRACTOR, the CONTRACT PRICE will be <br />' subject to adjustment in an amount equal to the actual cost incurred by SUBCONTRACTOR as <br />a result of the suspension. Such costs must be substantiated by written records or otherwise <br />proven to the satisfaction of the CONTRACTOR. Further, the time of performance of the <br />CONTRACT will be subject to extension by the actual duration of the suspension plus a <br />reasonable additional period for remobilization. The CONTRACT will, accordingly, be <br />amended by a CHANGE AGREEMENT provided, however, that any claim by SUB- <br />' CONTRACTOR for an adjustment hereunder must be asserted within 30 calendar days after <br />receipt of written notice to resume the WORK. <br />' If the CONTRACT, or a specified part thereof, is terminated by convenience of the <br />CONTRACTOR, SUBCONTRACTOR will be compensated for the reasonable cost of all <br />WORK performed or materials furnished including a reasonable profit on the completed portion <br />of the specified part thereof, but shall receive no profit for unperformed WORK. In no event <br />shall the total sum paid SUBCONTRACTOR exceed the current CONTRACT PRICE. <br />GC-31.0 TERMINATION FOR DEFA T <br />Should SUBCONTRACTOR fail to commence the WORK or a portion thereof within the <br />specified time, or to prosecute said WORK continuously with sufficient workmen and equipment <br />to insure its wmpletion within the time herein specified or as required by an agreed-upon <br />performance schedule, or to perform in a safe manner, or to comply with any provision of this <br />CONTRACT, CONTRACTOR may elect to give notice in writing of such default, specifying <br />the same. If SUBCONTRACTOR, within a period of 72 hours after receipt of such notice, shall <br />not procced in accordance therewith to remedy said default, then CONTRACTOR shall have full <br />' power and authority, without process of law and without violating this CONTRACT, to take the <br />prosecution of the WORK, or a portion thereof, away from the SUBCONTRACTOR and <br />complete it by contracting with other parties, using CONTRACTOR'S own forces or using such <br />' other measures as in CONTRACTOR'S opinion are necessary for its completion, including the <br />' 3-11 <br />