Laserfiche WebLink
Battle Mountain Resowces Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-1 I2 <br />May 2003 Monthly Report <br />Page 3 <br />Table 1-May 2003 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements (continued) <br />Monitorin Site Date De th to Water feet <br />BF-4 OS/31J03 25.87 <br />_ _ _ <br />BF-SR ~ _ <br />~OS/31/03 31.62 <br />BF-6 05/31/03 31.76 <br />BF-7R 05/31/03 _ _ <br />~ _ __43.13 <br />BF-8 05/31/03 D <br />BF-9 05/31/03 42.00 <br />BF-10 05!31/03 _ _43.10 <br />~~ <br />BF-11 05/31/03 44.14 <br />BF-12 05/31/03 42.33 <br />BF-13 05/31/03 _ <br />35.29 <br />BF-14 05/31/03 33.73 <br />_ <br />DW-1 05/31/03 34.07 <br />DW-2 _ <br />05/31/03 __ <br />4 26.83 <br />PW-1 05/31/03 28.79 <br />_ -- <br />PW-2 05!31/03 28.60 <br />PW-3 OS/31J03 36.23 <br />_ <br />PW-4 ~ 05/31/03 30.14 <br />PW-5 05131!03 26.40 <br />SF-1 05/31/03 _ 18.98 <br />SF-1R 05/31/03 _ 19.01 <br />SF-2 05/31/03 26.4b <br />SF-3 05/31/03 <br />~ 44.22 <br />SF-4 _ <br />05/31/03 26.55 <br />SF-5 OS/31/03 _ _ 32.97 <br />~ <br />PC-2 _ 05/31/03 _ 39.73 <br />D8724 ~ 05/31/03 59.97 <br />_ _ <br />LS-1 ~ 05/28/03 _ _ _ _ _Dry <br />LS-2 05/28/03 D <br />LS-3 05/28/03 Dry <br />LD-1 05/28/03 D <br />LD-2 _ __ <br />05/28/03 a D <br />LD-3 05/28/03 ~ ~ Dry <br />