Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />May 2003 Monthly Report <br />Page 4 <br />Table 2 -May 2003 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer ~ Date ~ Depth to <br />Water feet Total Depth <br />ft Volume of <br />Water ft <br />P6 05/28/03 D 72.46 _0.00 <br />P7 05/28/03 __ Dry 92.50 0.00 <br />P8 05(28(03 96.83 <br />~ <br />~- 97.51 0.68 <br />P9 05/28/03 71.79 72.30 0.51 <br />P10 05/28/03 57.44 58.30 0.86 <br />Pil 05/28/03 41.20 41.80 0.60 <br />P12 05/28/03 41.51 41.71 0.20 <br />P13 05/28/03 40.99 41.34 0.35 <br />P14 05/28/03 Dry 41.24 0.00 <br />P15 05/28/03 D 41.10 0.00 <br />During May 2003, no water treatment plant sludge management was conducted. Table ? <br />below identifies water treatment plant sludge management for calendar year 2003 to date. <br />Table 3 -Calendar Year 2003 Water Treatment Plant Sludge Management <br />Date Approximate Tonnage <br />Mana ed Sludge Disposition <br />Mazch 12-I5, 2003 670 Tailing Dis osal Area <br />A ril 17-18, 2003 600 Dryin Pad <br />Should you have any questions or comments, please do not hesitate to contact either Mr. <br />Julio Madrid (719) 379-0799 or myself (303) 324-2630 or (970) 325-4482. <br />Si~ly, <br />ill L e <br />Directo of Env. Affairs <br />Cc: Julio Madrid <br />file <br />