Laserfiche WebLink
1 <br />I. <br /> <br />1 I <br />I~ <br />;, <br />1 <br />I' <br />;'. <br />;i, <br />I. <br />II <br />1 <br />i <br />i <br />1 <br />1 <br />1 <br />- 2 - <br />During the third and last ghase of the study, more detailed <br />work has been performed to assess the feasibility of the con- <br />struction of individual structures or facilities that are lo- <br />cated within the landslide area and to provide the designer <br />with appropriate design recommendations for them. Numerous <br />meetings have been held with the representatives of Merrick <br />and Company and ARCO Coal Company during the course of our <br />work and individual problems have been discussed. The results <br />of this phase of the studies are presented in this report. <br />1.2 SCOPE OF THE STUDIES <br />The scope of the Phase 3 of our study was to evaluate the <br />interaction of the landslide deposits and the structures or <br />facilities located within the landslide area as it was de- <br />lineated during the Phases 1 and 2; t11e proposed mine entries <br />and mine bench were of particular interest. The proposed access <br />road and other structures or facilities have been included in <br />our studies although less detailed field and office work have <br />been performed in relation to them. <br />1.3 METHOD OF THE STUDIES <br />~ Our previous report (see reference in part 1.1) concluded <br />~~. field and office work related to the delineation and character- <br />ization of the landslide; results of this part of the study <br />i, will not be repeated within this report. <br />To accomplish the scope a£ Phase 3, the .fo.llowing work has <br />been performed: <br />1. Drilling of a total of six borings E-l, E-2, E-3 (these <br />three holes were assigned symbols P-1, P-2, and P-3 in our <br />I <br />oeo«.ow mNwn+a nc <br />