My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01675
DRMS
>
Back File Migration
>
Report
>
REP01675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:32:09 PM
Creation date
11/26/2007 10:02:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1995
Doc Name
APPENDIX A TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' Access roads required for construction operations or for the convenience of the Contractor shall <br />be approved by the Owner and maintained in a condition acceptable to the Owner at the <br />Contractor's expense. Upon completion of construction, such roads shall be reclaimed to <br />approximate original conditions unless otherwise directed by the Owner. <br />' 2.3 Suspension and Resumption of Operations <br />' The Contractor shall suspend fill placement and foundation preparation operations whenever <br />conditions for such operations are unsatisfactory due to rain, snow, wind, cold temperatures, or <br />any other reason deemed detrimental to said work by the Engineer. <br />' The Contractor shall be responsible for protection of excavations and fills from inclement <br />weather. Where operations have been suspended, the effects of the rain, wind, or other adverse <br />conditions shall be considered by the Contractor before resuming construction. Fill placed on <br />' frozen or overly wet surfaces shall be considered unacceptable, as determined by the Engineer, <br />and removed at the Contractor's expense. Equipment shall not be allowed to travel on fill <br />materials until the fill has dried sufficiently to prevent excessive rutting and to allow the <br />' equipment to be operated satisfactorily. If such rutting does occur, the Contractor shall re-level, <br />scarify, dry, and recompact the material to whatever depth is required, with the re-leveling and <br />scarifying being at the Contractor's expense. <br />2.4 Protection and Maintenance <br />' I The Contractor shall maintain all fill placed in a condition satisfactory to the Engineer. <br />1 The Contractor shall take such steps as are necessary to avoid ponding of water on the fill or <br />contamination of the fill by traffic or other causes, and shall at all times keep the fill surface and <br />' slopes free from rubbish, rejected or unsuitable fill, or waste materials. <br />' It is the Contractor's responsibility to maintain protection of the liner and liner covering lined <br />areas in such a manner as to prevent erosion due to inclement weather and snowmelt. Should <br />this protection be breached, it is the Contractor's responsibility to rehabilitate said liner system <br />' to approved conditions prior to resumption of work. <br />' 2.5 Communications <br />All notices, demands, requests, instructions, approvals, proposals, and claims must be in <br />t writing. <br />-~- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.