My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01675
DRMS
>
Back File Migration
>
Report
>
REP01675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:32:09 PM
Creation date
11/26/2007 10:02:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1995
Doc Name
APPENDIX A TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' S.2 Access Roads <br />Contractor's access roads shall be planned in such a manner that excavation of said roads shall <br />coincide, to the extent practicable, with the construction of a permanent road and other <br />' excavations associated with the project. Prior to development of access roads, the Contractor <br />shall submit a plan showing their location and size for the Engineer's approval. <br />' S.3 Borrow Areas <br />Borrow areas shall be established, as necessary, for embankment materials. The location, <br />physical dimensions, and depth of stripping or extent of existing material stockpiles shall be <br />' identified by the Engineer prior to commencement of work requiring such borrow material. <br />Within borrow areas, cut slopes shall be maintained at 3:1 or less. <br />6.0 FILL MATERIALS <br />' 6.1 General <br />' Fill materials shall be obtained from approved sites and local borrow areas. Road base <br />materials, if required, shall be either produced in the vicinity of the site or imported. Selective <br />borrowing of materials will be required. <br />' , No embattlement materials shall be placed until the foundation preparations have been completed <br />' and approved by the Engineer. Subsequent placement of fill shall be made only in areas <br />approved by the Engineer. Placement of the fill shall be done to the lines and grades shown on <br />the Drawings. <br />' Fill shall be placed in near horizontal lifts unless otherwise approved by the Engineer. Fill <br />placement procedures and equipment shall be organized and suitable for constructing a relatively <br />uniform fill meeting minimum density and/or compactive effort requirements, as specified. Fill <br />surfaces shall be graded to drain as materials are placed. The Contractor shall dewater or <br />' provide drainage for ponded water conditions in fill areas. <br />The procedures for the construction using fill materials shall be discussed with, and approved <br />by, the Engineer prior to placement. In particular, construction procedures shall be such to <br />prevent damage to synthetic liners, contamination or excessive compaction of drainage blanket <br />materials or damage to drain pipes. Construction procedures shall incorporate methods for <br />t -i i- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.