My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01675
DRMS
>
Back File Migration
>
Report
>
REP01675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:32:09 PM
Creation date
11/26/2007 10:02:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1995
Doc Name
APPENDIX A TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' 5.1.2 Handling of Material <br />' The Contractor shall use only the materials which meet applicable specifications, except as <br />allowed by the Engineer. Such materials may be placed in the designated final locations du•ect <br />' from the source, or may be placed in temporary stockpiles and later placed in the final location <br />as approved by the Engineer. The Contractor shall perfotm excavation operations so as to <br />facilitate stockpiling and rehandling of excavated material as required. <br />5.1.3 Cuts and Sloaes <br />' The Contractor shall inspect all temporary and permanent open-cut excavations on a regular <br />basis for signs of instability. Should signs of instability be noted, the Contractor shall undertake <br />remedial measures immediately and shall notify the Engineer as soon as possible. It will be the <br />Contractor's responsibility to remove all loose material from the excavation slopes and to <br />' maintain the slopes in a safe and stable condition at all times during the progress of the work. <br />Final borrow area cut slopes shall be no steeper than 3:1. Final surfaces shall be smoothed of <br />irregularities to the satisfaction of the Engineer. Final cut surfaces shall be sloped to drain so <br />that no ponding develops from direct precipitation and runoff. <br />5.1.4 Excess Excavation <br />' ~ All necessary precautions shall be taken to preserve the material below and beyond the lines of <br />excavation in the soundest possible condition. Where required to complete the work, all such <br />excess excavation and overexcavation shall be refilled with materials meeting applicable <br />requirements and furnished and placed to the satisfaction of the Engineer. <br />1 5.1.5 Disposal of Excavated Materials <br />' Excavated materials [hat aze unsuitable for, or are in excess of, permanent construction <br />requirements shall be wasted. Waste piles shall be located outside the limits of the disposal area <br />as approved by the Engineer. Placement will not interfere with the natural flow within storm <br />' drainage areas, with the operation of the tailings disposal area facilities or other mining <br />sttvctures. They will neither detract from the appearance of the completed project nor interfere <br />' with the accessibility of the various parts of the work. Waste piles shall be graded and trimmed <br />to reasonably regular lines and stable slopes. <br /> <br /> <br />-~ o- <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.