My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01675
DRMS
>
Back File Migration
>
Report
>
REP01675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:32:09 PM
Creation date
11/26/2007 10:02:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1995
Doc Name
APPENDIX A TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' 2.7 As-Built Drawings <br />r The Contractor shall provide the Owner with "as-built" Drawings by properly recording all <br />dimensions that are necessary for construction but are not indicated on the plans, and all changes <br />to any dimensions on the plans. The Contractor shall provide the Owner with alll measurements <br />and all data required. Preparation of the "as-built" Drawings will be the responsibility of the <br />' Contractor. <br />2.8 Demobilization <br />Demobilization shall consist of the removal of temporary strictures and shaping, contouring, and <br />' grading to provide surfaces for permanent stabilization and reclamation as required by the <br />Owner. <br />The Contractor shall remove all trash, debris, and waste material from the site and properly <br />dispose of said material. The Owner shall have the right to determine what is waste material or <br />rubbish and the manner and place of disposal. All material furnished for the execution of the <br />' work and thereby purchased by the Owner shall remain the property of the Owner. <br />The Contractor shall clean out all installations and tear down and remove all temporary <br />structures built by the Contractor. Any existing structures or installations shall leave the site area <br />in a condition at least as good as the condition prior to construction. The Contractor shall also <br />grade the construction site to provide proper drainage and give a sightly appearance. <br />' The final condition of the construction site is subject to the approval of the Owner. <br />3.0 ENVIRONMENTAL REQUIIiEMENTS <br /> <br /> <br /> <br /> <br /> <br />3.1 General <br />The Contractor shall store materials, confine his equipment, and maintain construction operations <br />within the limits of applicable laws, ordinances, permits, or as outlined by the Engineer. Care <br />shall be exercised to avoid blocking roads or in any other way interfering with the Owner's <br />operations, or presenting a hazard to Owner's personnel and equipment, or to the public. <br />The Contractor shall at all times keep the work site neat, tidy, and free of waste materials or <br />rubbish resulting from his work. Fuel, lubricating oils, and chemicals shall be stored and <br />-ti- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.