My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01675
DRMS
>
Back File Migration
>
Report
>
REP01675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:32:09 PM
Creation date
11/26/2007 10:02:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1995
Doc Name
APPENDIX A TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />i <br /> <br />i <br /> <br />t <br /> <br /> <br /> <br />1 <br />dispensed in such a manner as to prevent or contain spills and prevent said liquids from reaching <br />local streams or groundwater. <br />3.2 Diversion and Care of Water <br />The site is in a dry climate area and anticipated to be dry at the time of construction; however, <br />thunderstorms and runoff may occur during the construction period. Depending upon the <br />duration and severity of the thunderstorm, flash floods are possible. It shall be the Contractor's <br />responsibility to protect his equipment and materials, as well as completed or portions of the <br />work in progress from damage in the event of local thunderstorms or flash floods. The <br />Contractor shall provide dewatering, as needed, at his own expense to maintaui drained work <br />areas. <br />The Contractor shall sequence his construction activities to minitnize flash flood damage to the <br />earthworks covered under these Specifications. In the event neglect or poor construction planning <br />results in flood damage to the facilities constructed or being constructed, the facilities shall be <br />repaired or replaced to the satisfaction of the Engineer, at the Contractor's expense. Plans for <br />remedial work shall be submitted by the Contractor for review and approval my the Engineer <br />prior to commencement of such work. <br />3.3 Dust Abatement <br />' During the performance of the work defined by these Specifications or any operations <br />appurtenant thereto, whether on a right-of-way provided by the Owner or elsewhere, the <br />' Contractor shall furnish all labor, equipment, materials, and means required to ;perform proper <br />and efficient measures to prevent fugitive dust excursion. The Contractor shall prevent dust <br />which has originated from the Contractor's operations from damaging land, vegetation, and <br />dwellings, or causing a nuisance to persons. Dust shall be controlled to a degree acceptable to <br />the appropriate state and federal agencies, and to the Engineer. <br />3.4 Limits of Work <br />The Contractor shall confine his equipment, the storage of materials, and the operation of <br />workmen to limits indicated by law, ordinances, permits, or selected by the Engineer, and shall <br />not unreasonably encumber the premises with his materials. Caution shall be exercised at all <br />times to avoid blocking plant or other access and haul roads or in any other way interfering with <br />the Owner's operations. The Contractor shall not, at any time, engage or instigate activities that <br />would, in the Owner's or Engineer's opinion, present a hazard to Owner's personnel, or <br />operations, or to the public. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.