Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />September 2003 Monthly Report <br />Page 2 <br />During September, the West Pit water treatment plant operated efficiently discharging a <br />total of 11,511,400 gallons (35.33 acre-feet) of water to Rito Seco Creek, a total of <br />1,144,200 gallons (3.51 acre-feet) of water was transferred from the water treatment plant <br />to the tailing impoundment, and seepage along Rito Seco Creek remained dry. The <br />monthly precipitation accumulation for September was 2.12 inches, with the largest <br />accumulation (i.e., 1.2 P') occurring on September 9a'. <br />Table 1-September 2003 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitorin Site Date De th to Water feet <br />M-4R 9/30/03 44.23 <br />M-6 9/30/03 Dr <br />M-7 9/30/03 Dr <br />M-8 9/30/03 Dr <br />M-9 9!30103 140.03 <br />M- ] 0 9/30/03 26.04 <br />M-1 1 R 9/3 0/03 44.83 <br />M-12 9/30/03 178.67 <br />M-13R 9/30/03 131.09 <br />M-14 9/30/03 _ 136.27 <br />M- 15 9/30/03 82.34 <br />M-16 9/30/03 23.47 <br />M-19 9/30/03 24.83 <br />M-21 9/30/03 18.73 <br />M-22 9/30/03 17.18 <br />M-26 9/30/03 17.10 <br />M-32 9/30/03 44.15 <br />M-33 9/30/03 44.57 <br />M-34 9/30/03 22.45 <br />BF-4 9/30/03 25.76 <br />BF-6 9/30/03 31.71 <br />LS-1 9130/03 Dr <br />LS-2 9/30/03 Dr <br />_ <br />LS-3 9/30/03 Dr <br />LD- I 9/30/03 Dr <br />LD-2 9/30/03 Dry <br />LD-3 9/30/03 Dry <br />