My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01149
DRMS
>
Back File Migration
>
Report
>
REP01149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:31:07 PM
Creation date
11/26/2007 9:53:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
10/14/2003
Doc Name
September 2003 Monthly Report
From
Battle Mountain Resources Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />October 8, 2003 <br />Mr. Jim Dillie <br />State of Colorado ,/' <br />Division of Minerals and Geology / <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />September 2003 Monthly Report <br />Dear Mr. Dillie: <br />~I~? ~ ~ ~~~~ / <br />9i~»si~n of i,linenls and gaolo9y <br />The following summarizes monitoring and site activities at the Battle Mountain <br />Resources Inc. (BMRI), San Luis Project for the month of September 2003. <br />Surface and ground water monitoring and analysis were completed for all required sites <br />during the month per the terms and conditions of the TR-32 Quality Assurance and <br />Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on September 30`s, no water was present <br />for sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezo- <br />meters, the West Pit and the tailing embankment monitoring wells on September 3011i. <br />The September 30`h tailing impoundment piezometer measurements identified these <br />installations were either dry or contained less than 12 inches of water as illustrated in <br />Table 2. Tables 1 and 2 below identify the depth to water measurements collected for <br />each of the site monitoring wells, piezometers and lysimeters as required by the terms <br />and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently <br />during the month to minimize the collection pond level. The leak detection system was <br />measured on September 24~'. The September collection pond underdrain flow average <br />was 42.80 gpm and a total of 480 gallons of water was excavated from the leak detection <br />system yielding a monthly average of 18.46 gpad. <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Aax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.