My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP01149
DRMS
>
Back File Migration
>
Report
>
REP01149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:31:07 PM
Creation date
11/26/2007 9:53:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
10/14/2003
Doc Name
September 2003 Monthly Report
From
Battle Mountain Resources Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />September 2003 Monthly Report <br />Page 3 <br />Table 2 -September 2003 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer Date Depth to <br />Water feet Total Depth <br />(ft Volume of <br />Water ft) <br />P6 9/30/03 D 72.46 0.00 <br />P7 9/30/03 Dr 92.50 0.00 <br />P8 9/30/03 97.03 97.51 0.48 <br />P9 9/30/03 72.08 72.30 0.22 <br />P10 9/30/03 57.55 58.30 0.75 <br />P11 9/30/03 41.27 41.80 0.53 <br />P12 9/30/03 41.65 41.71 0.06 <br />P13 9/30/03 41.03 41.34 0.31 <br />P i 4 9/3 0/03 Dr 41.24 0.00 <br />P 15 9/30/03 Dry 41.10 0.00 <br />During September 2003, water treatment plant sludge was transferred to the tailings <br />facility and sludge was removed from water treatment plant ponds 2 and 3. This sludge <br />included sludge removal from the drying pad and transferred to the tailing facility <br />(September IOth-14th), sludge removal from treatment pond 3 (September 18th-19th), and <br />sludge removal from old pond 2 (currently unused pond) and direct transfer to the tailing <br />facility (September 27"'-30`h). Direct transfer of the old pond 2 sludge was facilitated by <br />the length of time the sludge was allowed to dewater while in storage within the pond. <br />Table 3 below identifies water treatment plant sludge management for calendar year 2003 <br />to date. <br />Table 3 -Calendar Year 2003 Water Treatment Plant Sludge Management <br />Date Approximate Tonnage <br />Mana ed Sludge Disposition <br />March 12-15, 2003 670 Tailin Facilit <br />A ril 17-18, 2003 160* Dr in Pad <br />Jul 25-26, 2003 10 Tailin Facilit <br />Se tember 10-14, 2003 150 Taili^ Facilit <br />Se tember 18-19, 2003 150 Dr in Pad <br />September 27-3Q 2003 120 Tailin Facility <br />" Quantity previously reported was corrected to reflect the estimated quazttity transferred from the drying pad to the <br />tailing facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.