My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP00807
DRMS
>
Back File Migration
>
Report
>
REP00807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:29:44 PM
Creation date
11/26/2007 9:46:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Report
Doc Date
6/17/1996
Doc Name
ABOVEGROUND STORAGE TANK SYSTEM SUBSURFACE INVESTIGATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />4.0 DUAL PIIASE EXThiI CTIO[V SYSTEM <br />4.1 EITRACTION IVELI; INST~iLLATION <br />4.1.1 L•.rtrrrction IVe!! Locnt'lons <br /> <br />A total of four DPG wells will be installed by ERM approximately in the locations <br />dcpictal in Drawing 1. The actual locations of the DPG wells is subject to verification of <br />underground u(ilities. <br />4.1.2 Grtrnctiar IVe!! Courpilntions <br /> <br />"I'hc conu'actor shall amiplclc soil borings in the locations of cacti of the DPG wells using <br />hollow stem auger drilling tcdutiqucs. 13oraholcs for the DPG wells will be completed to <br />approximately 17 feet below the existing ground surfaces As cacti boring is being drilled, <br />a quali(ial I:RM geologist will record lithology, organic vapor measurements, visual and <br />olfactory observations, and other pertinent field observations. Soil core samples will be <br />collected at continuous intervals over the enlirc length of the borehole. <br />All drilling equipment will be dccontaminatcd prior to drilling each borehole, using a <br />high pressure wash and potable water. All sampling equipment will be dccontaminatcd <br />prior to collecting cacti sample, using a Liquinox/distilled water wash, followed by a <br />distilled water rinse. <br />~1J1.2 Exuac[ion {VeIlGxs[n((criial <br />Dual-phase extraction wells will be installed through hollow stem augers in each of the <br />borcholes. The wells will be constructed of 2-inch diameter Schedule 40 PVC flush joint <br />casing, and 2-inch diameter Schedule 40 PVC screen (0.010" machine slotted). A 2.0- <br />GRM-Rocky tloumain, Inc. 6 Primed on Recycled Paper <br />P:\ 1000\S W l'C\9610 t 9. t\Design.Doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.