Laserfiche WebLink
<br />.3.0 ELECTRICAL <br />3.1 ELECTRICAL SUPPLY <br /> <br />SWPC shall install clectrical service to the systcm, and shall furnish all labor, materials, <br />equipment, and incidentals to install all such electrical service, as required by the design. <br />3.2 ELECTRICAL LA }'OUT <br />ERM shall install all clectrical components of die systcm as described in this design. <br />S WI'C shall assist CRM in the wiring of the components. <br />'fhc systcm shall require it, own indcpcndau clectrical power feed, and brcakcr panel. <br />'fhc panel shall enclose a main shut-off, and all necessary breakers. Distribution from the <br />main brcakcr box shall supply a weatherproof convenience receptacle, heal trace wiring, <br />evacuation and discharge pumps, and blower. Disu'ibution to the pumps and blower shall <br />be through control panels equipped with Icvcl switches. An electrical diagram for the <br />systcm is includcct as Drawing 4. <br />3..3 7'lll?Ith1A1. ('ROTEC"fION <br />'Chc systcm shall be equipped with thermal protection which will include heating cables <br />wrapped around above-grade piping, and insulating covers wrapped around the knock-out <br />tank and oil-water separator. The heating cables will be hardwired into the breaker panel. <br />ERA1-Rocky Mountain, Inc. `J Printed on Recycled Papzr <br />P:\ 1000\S N' PC\9G 10 l9. l \Desisn. Doc <br />