Laserfiche WebLink
<br />2. /.3 Engineering Controls <br />SWPC shall furnish and install concrete barriers to provide the DPG system with <br />protection from vehicular traffic at the facility. <br />2.1.4 System Inslnllrrlion <br />CRM shalt famish all labor, equipment, materials, and incidentals that arc required for the <br />installation of [hc system, unless otherwise noted. <br />2. /. S Sysleur Slnr!-Up and Testing <br />G2M sl+all start the system upon completion of consuvction. Prior to the start of the <br />system, SWPC will be notilicd. "I~hc time of system start-up shall be coordinated with <br />SWPC, and shall be subject to SWPC approval. SWPC may choose to aucnd the period <br />of system start-up and testing, at their discretion. <br />Once started, the system will be inspected and tested by LRM for defects in construction <br />which may have occurred during installation. <br />1.1.( Urnmrrslrnlinn <br />L'•RM will demonstrate successful operation of the system. The demonstration will <br />include operation of all Icvel switches, and mcchanicals associated with the system, The <br />date and time of the demonstation will be coordinated with SWPC. <br />GRM-Rocky Mountain, Inc. 4 Printed on Recycled Paper <br />P:\ 1000\SWPC\9G I O 19. I \Design.Doc <br />