Laserfiche WebLink
<br /> <br />2.0 GF.NER~I L RT_QU/REMENTS <br />2.1 SUAIA/ARYOF{VORK <br />2.1.1 Construction Permits, Fees, oral Notices <br /> <br />ERM-Rocky Mountain shall prepare and submit on behalf of SWPC the necessary <br />"Notice of Intent to Construct Monitoring Holes" to the Office of the State Engineer. <br />ERM-Rocky Mountain will assume all other applicable permits, fees and notices required <br />for the construction of the DPC system shall be provided by S WPC. <br />2.1.2 Utilities <br />2.1.2.1 Verification o% L•:ristiug Utilitic.r <br />SWPC had previously provided L'•RM with a utility map showing the appro~imatc <br />location of buried utilities in the vicinity of the AS"f system. A utility search was <br />previously conducted in the vicinity of the AST system as part of the subsurface <br />investigation conducted by LRM in May of 199G. SWPC shall assist ERM in <br />dctcrmiuing the positions of the DPE wells. [n addition, ERM shall probe the locations <br />of the recovery wells prior to drilling. <br />2.1.2.Z Grstnllntion ojElectr•ical Utilities' <br /> <br />SWPC shall provide and maintain electrical service tot he DPE system, as specified for <br />this design. SWPC shall also provide ERM with assistance in wiring the electrical <br />components of the system. <br />LRM-Rocky Mountain, Inc. 3 <br />P.\ 100015 W PC\9G 1019. I \Desisn. Doc <br />Printed on Recycled Paper <br />