Laserfiche WebLink
• RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE I.D. NO. 1211-CO-09-01370-O1 (SURFACE WASTE PILE) <br />PILE I.D. NO. 121 I-CO-09-01370-02 (OLD NO.9 EXCAVATION) <br />INSPECTOR SIGNATURE: ~~~~ ~a~J <br />INSPECTOR TITLE: ~?~ . <br />Under the supervi ion of Michael Ludlow, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />A. Stability of fill (quarterly inspection) <br />/l'~/J B. Critical construction periods: <br />I. Removal of all organic materiaVtopsoil <br />2. Placement of underdrainage system <br />• 3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />5. Revegetation <br />NOTES: <br />• file:l:~EN~ENVIRO <br />