Laserfiche WebLink
• RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE I.D. NO. 121 I-CO-09-01370-01 (SURFACE WASTE PILE) <br />PILE I.D. NO. 121 I-CO-09-01370-02 (OLD NO.9 EXCAVATION) <br />DATE/TIINE: //~,P~tf• ~ ; ~ G'l~'/~~7 y, / <br />INSPECTOR SIGNATURE: i/x~+&'l~L,^^~ ///ZC <br />INSPECTOR TITLE: ~~ ~ r <br />Under the supe vision of Michael Ludlow, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />'~ A. Stability of fill (quarterly inspection) <br />1~~~ B. Critical construction periods: <br />I .Removal of all organic material/topsoil <br />2. Placement of underdrainage system <br />• 3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />NOTES: <br /> <br />5. Revege[ation <br />