Laserfiche WebLink
a <br />• RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE I.D. NO. 121 I-CO-09-01370-01 (SURFACE WASTE PILE) <br />PILE I.D. NO. 121 ]-CO-09-01370-02 (OLD NO.9 EXCAVATION) <br />INSPECTOR SIGNATURE: ,~:!~~~.1 <br />INSPECTOR TITLE: ~ ~~ <br />Under the supervision of Michael Ludlow, Colorado P.E. #24046 <br />This inspection was conducted [o comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />=A. Stability of fill (quarterly inspection) <br />2~B. Critical construction periods: <br />1. Removal of all organic materiaUtopsoil <br />_2. Placement of underdrainage system <br />• 3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />5. Revegetation <br />NOTES: <br /> <br />• file:I:~EMENVIRONMENTAL~EMPIREUNSPREP\WASTEPILEFORM.DOC ~\c~, ~.~~~,~~~` ~~~ <br />