Laserfiche WebLink
<br />• RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE LD. NO. 121 I-CO-09-01370-O1 (SURFACE WASTE PILE) <br />DA <br />INS <br />INSPECTOR TITLE: ~~~ v / /lG~~ <br />Under the supervi on of Michael Ludlow, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />~. Stability of fill (quarterly inspection) <br />r' ~r- B. Critical construction periods: <br />1. Removal of all organic materiaUtopsoil <br />2. Placement of underdrainage system <br />• 3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />5. Revegetation <br />NOTES: <br />• file:l:tEMENVIRONMENTALtEMPIREVNSPREP\WASTEPILEFORM.DOC <br />J "' <br />r~~l Vl. <Gc. <br />f `v .~ <br />24046 ~~__ <br />PILE I.D. NO. 1211-CO-09-01370-02 (OLD NO.9 EXCAVATION) <br />