1 <br />3.0 CONSTRUCTION EARTHWORK <br />t All construction materials used in the construction of the Phase II Raise 2 of the main <br />embankment were borrowed from the open pit mining activities at the site and placed in a <br />stockpile by the owner, BMRI, prior to the start of construction. The materials were borrowed <br />selectively based on the gradation required as outlined in the project specifications. In general, <br />' the material would be described as TYPE 1: gravely sand. <br />The earthwork contractor, SLV Earth Movers, Inc. mobilized to the site on AulSttst 14, 1995 <br />t and demobilized on September 14, 1995. <br />' Initial construction began with the grading of the tailings in the footprint of the embankment <br />raise out to the upstream toe of the raise, to an elevation of approximately 8600 ft or slightly <br />' below. <br />Amoco Fabrics and Fibers Co. Type 4553 non-woven geotextile was placed over the tailings <br />prior to the placement of the first lift of fill, as per the design specifications. <br />On August 16, 1995 settlement markers were installed above the geotextile, prior ~:o placing the <br />initial lift of fill. Periodic surveys of the settlement markers were done by BMRI purvey crews. <br />Approximately 122,126 yd' of Type 1 fill material were placed in the Phase II Raise 2 <br />construction. <br />The original specifications for construction of the embankment raise set forth in the permit <br />application report dated September 1989 called for material Type 1 fill for constructing the <br />embankment raise as a homogeneous, mono-fill structure. The gradation limits for material Type <br />1 were revised by the Engineer to increase the allowable percent passing a No. 2(a0 sieve from <br />a maximum of 10 percent to a maximum of 35 percent. This revision was approved on January <br />4, 1994 as Technical Revision TR-016 to Permit No. M-88-112. <br /> <br /> <br />a <br /> <br />