Laserfiche WebLink
Reclamation Costs ($ thousands) <br />Henderson Mine <br />February 1989 <br />Page 4 <br />6 <br />East Branch Reservoir Shores (100 acres) <br />a) Dismantle, break even <br />b) Revegetate four acres at $1,045/acre <br />c) Fertilize shores, 41 acres, <br />one application <br />d) Buffer, 55 acres <br />7. Horseshoe Intake Shores (two acres) <br />a) Fertilize two acres, <br />one application <br />8. Ute Creek Reservoir Shores (12 acres) <br />a) Fertilize 12 acres, <br />one application <br />9. Tailing Deposition Area (2,446 acres) <br />a) Revegetate tailing, 754 acres at <br />$4,068/acre <br />$3,067 <br />b) Flood control 200 <br />c) Revegetate peri. road, 94 acres at <br />$700/acre 66 <br />d) Perm. use, bypass canal/road, 40 acres 0 <br />e) Buffer, 1,530 acres 0 <br />Total. 3,3 3 <br />10. Gravel Pit and Storage (54 acres) <br />a) Revegetate 35 acres at $1,045/acre $ 37 <br />b) Grading and site preparation 10 <br />c) Buffer, 19 acres 0 <br />Total. .~~ <br />11. RR Gravel Pit (five acres) <br />a) Grading and site preparation $ 1 <br />b) Revegetate five acres at $1,045 /acre 5 <br />Total. .~ <br />12. Contractor's Camp and Storage (nine acres) <br />a) Fertilize nine acres, one application $ 0 <br />Total . .~-~ <br />13. Borrow Area (four acres) <br />a) Revegetate three acres at $1,045/acre $ 3 <br />b) Fertilize one acre, one application 0 <br />Total . .~-3 <br />S 0 <br />4 <br />1 <br />0 <br />Total. .~ 5 <br />$ 0 <br />Total. .$ 0 <br />$ o <br />Total. .~ 0 <br />