Laserfiche WebLink
Reclamation Costs ($ thousands) <br />Henderson Mine <br />February 1989 <br />Page 5 <br />14. Powerline/Refuse Area (17 acres) <br />a) Dismantle, break even <br />b) Grading and site preparation <br />c) Revegetate road bed, three acres at <br />$1,045/acre <br />d) Fertilize slopes, 14 acres, one application <br />Total. . <br />15. Makeup Water Line/Pumphouse (eight acres) <br />a) Dismantle, break even <br />b) Grading and site preparation <br />c) Revegetate pumphouse, one acre at <br />$1,045/acre <br />d) Fertilize seven acres, one application <br />Total . . <br />16. <br />$ 0 <br />2 <br />3 <br />0 <br />.~5 <br />$ o <br />2 <br />1 <br />0 <br />.~~ <br />S 2 <br />2 <br />5 <br />i <br />0 <br />Total. 10 <br />17. E. Branch Flood Bypass (five acres) <br />a) Fertilize five acres, one application E 0 <br />Total. .~~ <br />18. Tailing Building/Road (45 acres) <br />a) Revegetate six acres at $1,045/acre $ 6 <br />b) Grading and site preparation 2 <br />c) Buffer, 39 acres 0 <br />Total. .~$ <br />19. Mill Water Return Line/Powerline (31 acres) <br />a) Revegetate road, eight acres at <br />$1,045/acre $ 8 <br />b) Grading and site preparation 2 <br />c) Fertilize slopes, 16 acres, one application 1 <br />d) Buffer, seven acres 0 <br />Total. .$~f <br />Tailing Line/Powerline (47 acres) <br />a) Dismantle <br />b) Grading and site preparation <br />c) Revegetate five acres at $1,045/acre <br />d) Fertilize slopes, 27 acres, <br />one application <br />e) Buffer, 15 acres <br />